Back to Dubai New Projects
Project evidenceDubai Motor CitySobha Realty

Sobha Orbis Tower B, Dubai Motor City

Sobha Orbis Tower B is the Dubai Motor City project entity associated with Sobha Realty. The 16 Jun 2026 project snapshot contains a recorded from-price of AED 1.2M, a source-record handover of 30 Dec 2028 and 1 Bed - 2 Bed across apartments. The official DLD match remains an advisor check unless the status panel says verified. Price, availability and commercial terms require a current developer check.

Dubai Motor City, Dubai

Recorded from price

AED 1.2M

Bedrooms

1 Bed - 2 Bed

Size range

541 - 992 sqft

Source handover

30 Dec 2028

Median PSF

AED 2,027

Project verification

Verify Sobha Orbis Tower B availability

Confirm current prices, unit availability, incentives and payment terms before shortlisting.

Community Intelligence

Location and Nearby: Dubai Motor City

Community-level evidence for this project location.

Median sale

AED 6.1M

AED 1,895 / sqft

Recent sales

5,327

583 in 3m

Rental benchmark

AED 350K

AED 70 / sqft

Off-plan supply

806

tracked projects

About Sobha Orbis Tower B

Sobha Orbis Tower B is tracked as a project entity in Dubai Motor City, Dubai. The captured project record names Sobha Realty as developer. It contains 1 Bed - 2 Bed across apartments. Its recorded from-price was AED 1.2M when the feed was captured on 16 Jun 2026. The same record lists 30 Dec 2028 as the handover date. Tower B is a tower-specific entity within Sobha Orbis. Development-wide claims are labelled separately from the unit and transaction rows matched to Tower B. Verify live inventory, price, payment terms and handover status before relying on them.

Developer: Sobha Realty
Unit mix: 1 Bed - 2 Bed across apartments
Handover: 30 Dec 2028

Evidence and editorial review

How this Sobha Orbis Tower B page was checked

Reviewed 16 Sept 2026
Source and methodology details for Sobha Orbis Tower B
CheckMethodDate or scope
Entity and claimsCompared the page entity with developer or authority sources and removed unsupported certainty.Reviewed 16 Sept 2026
Market evidenceUses the labelled PropertyStellar snapshot; project, tower and community scopes are not combined silently.Project feed captured 16 Jun 2026; official status checked separately where a publishable DLD match exists.
LimitationsTower B is a tower-specific entity within Sobha Orbis. Development-wide claims are labelled separately from the unit and transaction rows matched to Tower B.

Editorial responsibility

Written by Arjun Mehta, Property Investment Analyst.

Reviewed by Omar Al Mansouri, Dubai Real Estate Investment Consultant and UAE Real Estate Market Specialist.

Evidence sources

Unit layouts

Sobha Orbis Tower B Floor Plans

Compare representative floor-plan images by bedroom, property type and recorded size range. Confirm that a plan matches the exact available unit before reservation.

6 plan images

Project record refreshed 16 Jun 2026

1BR Apartments floor plan

Bedroom
1 Bed
Property type
Apartments
Area
536 - 701 sqft

Showing 1 representative unit layout. Open a preview to review the available plan images for that unit type.

Prices and Unit Types

Recorded bedroom, size and price ranges from the 16 Jun 2026 project feed. These rows describe the captured inventory, not live availability.

2 unit typesplans available

Apartments

Recorded from AED 850K

1 Bed

1BR Apartments

Area

536 - 701 sqft

Recorded price

AED 850K-1.9M

2 Bed

2BR Apartments

Area

985 - 988 sqft

Recorded price

AED 2.0M-2.0M

Payment Plan

Captured project-feed schedule from 16 Jun 2026. Confirm the active plan and unit eligibility before reservation.

Milestone% value
Pre-handover schedule
80%
Post-handover schedule
20%

Handover and Construction Status

Confirm handover and construction status before booking because developer release schedules and incentives can change.

Handover

30 Dec 2028

Launch

TBC

Construction status

To verify

Last refreshed

16 Jun 2026

Dubai Land Department

Official Project Status

Not enough verified official data is available yet. We will update this section once the evidence is stronger.

Advisor check

Official status

Advisor check

Review status

To verify

Last inspection

12 Sept 2026

Developer record

strong

Area service charge

Dubai Motor City Service-Charge Benchmark

DLD Service Charge Index benchmark from official records available for this community.

Details

Median

AED 15.7/sqft/yr

Average

AED 15.5/sqft/yr

Range

AED 0.4/sqft/yr - 58/sqft/yr

Records reviewed

60

Service-charge recordYearAED/sqft
Oia Residence - Unspecified2026AED 58/sqft
Terrace Apartment 3 - Motor City2026AED 23/sqft
Terrace Apartment 1 - Motor City2026AED 23/sqft
Terrace Apartment 4 - Motor City2026AED 23/sqft

Evidence

Comparable Project Evidence & Trends

Recent project evidence where available, with community benchmark evidence when direct project records are not strong enough yet.

Project-level evidence

Matched sales

1,266

1,266 in 12m

Matched median sale

--

-- / sqft

Latest verified sale

TBC

Project-level evidence

Community sales

5,327

583 in 3m

Community rent

AED 350K

AED 70 / sqft

Community sales trend

Monthly
Apr 26
820 salesAED 1.5M · AED 1,667/sqft
May 26
492 salesAED 1.4M · AED 1,413/sqft
Jun 26
768 salesAED 1.3M · AED 1,652/sqft
Jul 26
632 salesAED 1.4M · AED 1,673/sqft
Aug 26
684 salesAED 1.5M · AED 1,612/sqft
Sept 26
840 salesAED 1.1M · AED 1,835/sqft

Community rental trend

Monthly
Apr 26
386 contractsAED 113K · AED 67/sqft
May 26
614 contractsAED 103K · AED 73/sqft
Jun 26
770 contractsAED 110K · AED 77/sqft
Jul 26
736 contractsAED 101K · AED 69/sqft
Aug 26
644 contractsAED 102K · AED 73/sqft
Sept 26
170 contractsAED 99K · AED 73/sqft

Recent Sales

DateBedsTypeSale
4 Aug 20261 BedapartmentAED 1.0M
19 May 20261 BedapartmentAED 1.2M
14 Apr 20262 BedapartmentAED 2.2M
10 Apr 20262 BedapartmentAED 2.2M
16 Mar 20262 BedapartmentAED 2.0M

Recent Rentals

DateBedsTypeRent
9 Sept 20263 BedapartmentAED 270K
8 Sept 20263 BedapartmentAED 188K
8 Sept 20261 BedapartmentAED 105K
7 Sept 2026MixedvillaAED 370K
5 Sept 20261 BedapartmentAED 75K

Comparable Projects

Comparable projectFromEvidence

Sobha Solis Tower A

Sobha Realty

AED 1.2MDirect project evidence

Sobha Orbis Tower E

Sobha Realty

AED 1.2MDirect project evidence

Sobha Orbis Tower A

Sobha Realty

AED 1.1MDirect project evidence

Sobha Solis Tower C

Sobha Realty

AED 1.3MDirect project evidence

Sobha Solis Tower B

Sobha Realty

AED 1.4MDirect project evidence

Lifestyle & Amenities

Lobby in Building
Gym or Health Club
Swimming Pool
Jacuzzi
Kids Play Area
Barbeque Area
Data detailscollapsed

Developer

Sobha Realty

Project reference

20073

DLD reference

3070

Official status

Advisor check

Service charge

AED 15.7/sqft/yr

Launch

TBC

Handover

30 Dec 2028

Last refreshed

16 Jun 2026

Transaction scope

Direct project evidence

Internal links

Similar Off-Plan Projects

Frequently asked questions

Off-Plan Project FAQ

What is the starting price of Sobha Orbis Tower B?

The project feed captured 16 Jun 2026 recorded a from-price of AED 1.2M. It is a dated evidence point, not confirmation of today's inventory or price.

When is the handover date for Sobha Orbis Tower B?

The captured source record lists 30 Dec 2028. Confirm the current status with the developer and the DLD project-status service before contracting.

Who is the developer of Sobha Orbis Tower B?

Sobha Orbis Tower B is associated with Sobha Realty in the captured project record. See the official-source panel for the scope of the developer evidence.

What unit types are available at Sobha Orbis Tower B?

Sobha Orbis Tower B's captured project record contains 1 Bed - 2 Bed across apartments. This describes the recorded mix, not live availability.

What payment plan is offered for Sobha Orbis Tower B?

Pre-handover schedule: 80%, Post-handover schedule: 20%

What amenities does Sobha Orbis Tower B offer?

Sobha Orbis Tower B amenities include Lobby in Building, Gym or Health Club, Swimming Pool, Jacuzzi, Kids Play Area, Barbeque Area.

Is Sobha Orbis Tower B a good investment?

Review the price and payment plan against market evidence: median project PSF is AED 2,027, 1,266 matched sales rows, 5,327 community sales in 12 months, community rent benchmark AED 350K.

Where is Sobha Orbis Tower B located?

Sobha Orbis Tower B is located in Dubai Motor City, Dubai. Compare it with other off-plan projects in Dubai Motor City and the community intelligence page before shortlisting.

Are floor plans available for Sobha Orbis Tower B?

Sobha Orbis Tower B currently has 7 floor-plan signals in the available records.

HomeNew ProjectsJourney