Back to Dubai New Projects
Project evidenceDubai HillsEmaar

Greenside Residence Tower C, Dubai Hills

Greenside Residence Tower C is the Dubai Hills project entity associated with Emaar. The 16 Jun 2026 project snapshot contains a recorded from-price of AED 3.1M, a source-record handover of 29 Sept 2027 and 2 Bed - 3 Bed across apartments. The official DLD match remains an advisor check unless the status panel says verified. Price, availability and commercial terms require a current developer check.

Dubai Hills, Dubai

Recorded from price

AED 3.1M

Bedrooms

2 Bed - 3 Bed

Size range

1,090 - 1,797 sqft

Source handover

29 Sept 2027

Median PSF

AED 2,417

Project verification

Verify Greenside Residence Tower C availability

Confirm current prices, unit availability, incentives and payment terms before shortlisting.

Community Intelligence

Location and Nearby: Dubai Hills

Community-level evidence for this project location.

Median sale

AED 85.0M

AED 3,275 / sqft

Recent sales

3,538

455 in 3m

Rental benchmark

AED 2.4M

AED 656 / sqft

Off-plan supply

38

tracked projects

About Greenside Residence Tower C

Greenside Residence Tower C is tracked as a project entity in Dubai Hills, Dubai. The captured project record names Emaar as developer. It contains 2 Bed - 3 Bed across apartments. Its recorded from-price was AED 3.1M when the feed was captured on 16 Jun 2026. The same record lists 29 Sept 2027 as the handover date. Tower C is kept separate inside Emaar's Greenside Residence. Development-wide claims are distinguished from Tower C inventory and matched transaction rows. Verify live inventory, price, payment terms and handover status before relying on them.

Developer: Emaar
Unit mix: 2 Bed - 3 Bed across apartments
Handover: 29 Sept 2027

Evidence and editorial review

How this Greenside Residence Tower C page was checked

Reviewed 16 Sept 2026
Source and methodology details for Greenside Residence Tower C
CheckMethodDate or scope
Entity and claimsCompared the page entity with developer or authority sources and removed unsupported certainty.Reviewed 16 Sept 2026
Market evidenceUses the labelled PropertyStellar snapshot; project, tower and community scopes are not combined silently.Project feed captured 16 Jun 2026; official status checked separately where a publishable DLD match exists.
LimitationsTower C is kept separate inside Emaar's Greenside Residence. Development-wide claims are distinguished from Tower C inventory and matched transaction rows.

Editorial responsibility

Written by Arjun Mehta, Property Investment Analyst.

Reviewed by Omar Al Mansouri, Dubai Real Estate Investment Consultant and UAE Real Estate Market Specialist.

Evidence sources

Unit layouts

Greenside Residence Tower C Floor Plans

Compare representative floor-plan images by bedroom, property type and recorded size range. Confirm that a plan matches the exact available unit before reservation.

8 plan images

Project record refreshed 16 Jun 2026

2BR Apartments floor plan

Bedroom
2 Bed
Property type
Apartments
Area
1,072 - 1,312 sqft

3BR Apartments floor plan

Bedroom
3 Bed
Property type
Apartments
Area
1,406 - 1,796 sqft

Showing 2 representative unit layouts. Open a preview to review the available plan images for that unit type.

Prices and Unit Types

Recorded bedroom, size and price ranges from the 16 Jun 2026 project feed. These rows describe the captured inventory, not live availability.

2 unit typesplans available

Apartments

Recorded from AED 2.7M

2 Bed

2BR Apartments

Area

1,072 - 1,312 sqft

Recorded price

AED 2.7M-3.5M

3 Bed

3BR Apartments

Area

1,406 - 1,796 sqft

Recorded price

AED 3.7M

Payment Plan

Captured project-feed schedule from 16 Jun 2026. Confirm the active plan and unit eligibility before reservation.

Milestone% value
Pre-handover schedule
90%
Post-handover schedule
10%

Handover and Construction Status

Confirm handover and construction status before booking because developer release schedules and incentives can change.

Handover

29 Sept 2027

Launch

TBC

Construction status

To verify

Last refreshed

16 Jun 2026

Dubai Land Department

Official Project Status

Not enough verified official data is available yet. We will update this section once the evidence is stronger.

Advisor check

Official status

Advisor check

Review status

To verify

Last inspection

12 Sept 2026

Developer record

mismatch

Area service charge

Dubai Hills Service-Charge Benchmark

DLD Service Charge Index benchmark from official records available for this community.

Details

Median

AED 15.9/sqft/yr

Average

AED 12.2/sqft/yr

Range

AED 1.1/sqft/yr - 30/sqft/yr

Records reviewed

43

Service-charge recordYearAED/sqft
Socio - Dubai Hills Estate2026AED 30/sqft
Golfville - Dubai Hills Estate2026AED 29/sqft
Golf Suites - Dubai Hills Estate2026AED 26/sqft
Collective - Dubai Hills Estate2026AED 25/sqft

Evidence

Comparable Project Evidence & Trends

Recent project evidence where available, with community benchmark evidence when direct project records are not strong enough yet.

Project-level evidence

Matched sales

20

20 in 12m

Matched median sale

--

-- / sqft

Latest verified sale

TBC

Project-level evidence

Community sales

3,538

455 in 3m

Community rent

AED 2.4M

AED 656 / sqft

Community sales trend

Monthly
Apr 26
662 salesAED 6.6M · AED 2,476/sqft
May 26
350 salesAED 5.9M · AED 2,405/sqft
Jun 26
538 salesAED 4.8M · AED 2,328/sqft
Jul 26
636 salesAED 3.9M · AED 2,334/sqft
Aug 26
568 salesAED 3.5M · AED 2,296/sqft
Sept 26
308 salesAED 4.8M · AED 2,474/sqft

Community rental trend

Monthly
Apr 26
1,104 contractsAED 459K · AED 142/sqft
May 26
1,544 contractsAED 288K · AED 129/sqft
Jun 26
2,516 contractsAED 253K · AED 132/sqft
Jul 26
2,520 contractsAED 200K · AED 128/sqft
Aug 26
3,028 contractsAED 206K · AED 130/sqft
Sept 26
988 contractsAED 185K · AED 135/sqft

Recent Sales

DateBedsTypeSale
28 Jan 20253 BedapartmentAED 3.5M
28 Jan 20253 BedapartmentAED 3.4M
28 Jan 20252 BedapartmentAED 2.6M
1 May 20242 BedapartmentAED 2.7M
13 Dec 20232 BedapartmentAED 2.5M

Recent Rentals

DateBedsTypeRent
10 Sept 20263 BedvillaAED 265K
10 Sept 20263 BedvillaAED 210K
8 Sept 20262 BedapartmentAED 290K
8 Sept 20261 BedapartmentAED 74K
7 Sept 20262 BedapartmentAED 150K

Comparable Projects

Comparable projectFromEvidence

Mallside Residence

Royal Development Company

AED 2.7MDirect project evidence

Hyde Residences

City View

AED 2.4MDirect project evidence

Address Residences Tower A

Emaar

AED 2.3MDirect project evidence

Ellington House II

AED 2.3MDirect project evidence

Ellington House 4

AED 2.3MDirect project evidence

Lifestyle & Amenities

First Aid Medical Center
Gym or Health Club
Swimming Pool
Kids Play Area
Nearby Hospitals
Data detailscollapsed

Developer

Emaar

Project reference

17829

DLD reference

2705

Official status

Advisor check

Service charge

AED 15.9/sqft/yr

Launch

TBC

Handover

29 Sept 2027

Last refreshed

16 Jun 2026

Transaction scope

Direct project evidence

Internal links

Similar Off-Plan Projects

Frequently asked questions

Off-Plan Project FAQ

What is the starting price of Greenside Residence Tower C?

The project feed captured 16 Jun 2026 recorded a from-price of AED 3.1M. It is a dated evidence point, not confirmation of today's inventory or price.

When is the handover date for Greenside Residence Tower C?

The captured source record lists 29 Sept 2027. Confirm the current status with the developer and the DLD project-status service before contracting.

Who is the developer of Greenside Residence Tower C?

Greenside Residence Tower C is associated with Emaar in the captured project record. See the official-source panel for the scope of the developer evidence.

What unit types are available at Greenside Residence Tower C?

Greenside Residence Tower C's captured project record contains 2 Bed - 3 Bed across apartments. This describes the recorded mix, not live availability.

What payment plan is offered for Greenside Residence Tower C?

Pre-handover schedule: 90%, Post-handover schedule: 10%

What amenities does Greenside Residence Tower C offer?

Greenside Residence Tower C amenities include First Aid Medical Center, Gym or Health Club, Swimming Pool, Kids Play Area, Nearby Hospitals.

Is Greenside Residence Tower C a good investment?

Review the price and payment plan against market evidence: median project PSF is AED 2,417, 20 matched sales rows, 3,538 community sales in 12 months, community rent benchmark AED 2.4M.

Where is Greenside Residence Tower C located?

Greenside Residence Tower C is located in Dubai Hills, Dubai. Compare it with other off-plan projects in Dubai Hills and the community intelligence page before shortlisting.

Are floor plans available for Greenside Residence Tower C?

Greenside Residence Tower C currently has 10 floor-plan signals in the available records.

HomeNew ProjectsJourney